Dear users! Please be advised that from 13:00 (GMT+3) on September 14, 2026, to 23:45 (GMT+3) on September 28, 2026, system hardware will be under maintenance, amendments, and upgrades.
This service requires quite a lot of time and will be done with minimum effects on system operations. Meanwhile, some interruptions of 5 to 15 minutes may happen.

Press Release CIC on Fire Safety Systems

The six member Authorities of the (Bulgaria, Georgia, Romania, Russian Federation, Turkey, Ukraine) of the Black Sea Memorandum of Understanding on Port State Control will start a concentrated inspection campaign on Fire Safety Systems. The three-month campaign will start on September 1, 2012 and end on November 30, 2012 under the co-ordination of the Romanian Naval Authority. The campaign shall be conducted simultaneously with the Paris MOU, Tokyo MOU and other MOUs.