18 Jan 2012
Press Release CIC on Structural Safety and Load Lines
From 1st September 2011 to 30th November 2011, the BS MOU carried out a Concentrated Inspection Campaign (CIC) on on the structural safety and the Load Line Convention throughout the region. This campaign involved all member States of the BS MOU and was conducted in conjunction with the Paris MOU and Tokyo MOU. The Paris MOU Guidelines and Questionnaire were utilized. Each inspection asked 14 questions on the compliance of all types of ships with the structural safety requirements and the provisions of the International Convention on Load Lines.